Building the Model for Balansing Industrial Forces of Multinomenclature Production

Sergei Aleksandrovich Karpaev, Federal Research-and-Production Center Joint Stock Company ‘Research-and-Production Association ‘Mars’, Postgraduate Student at Ulyanovsk State Technical University; Engineer at Federal Research-and-Production Center Joint Stock Company ‘Research-and-Production Association ‘Mars’; an author of articles in the field of programming automatization of the enterprise business-processes and manufacturing planning. [e-mail: This email address is being protected from spambots. You need JavaScript enabled to view it. ]S. Karpaev,

Sergei Nikolaevich Larin, Federal Research-and-Production Center Joint Stock Company ‘Research-and-Production Association ‘Mars’, Candidate of Engineering; Associate Professor; graduated from the Faculty of Aircraft Construction of Ulyanovsk State Technical University; Deputy Head of the Complex Production and Engineering Department at Federal Research-and-Production Center Joint Stock Company ‘Research-and-Production Association ‘Mars’; an author of articles in the field of automatization of business-processes. [e-mail: This email address is being protected from spambots. You need JavaScript enabled to view it. ]S. Larin

Building the Model for Balansing Industrial Forces of Multinomenclature Production 000_10.pdf

The article offers a formalized model for constructing issue-related production plans (IRpp) on the basis of automated verification of process operations (pO). It reflects the mathematical algorithm for calculating the load distribution on working centers with reference to the specific equipment and performers as well as the search and finding algorithm for the interchangeable parts in designing pO of a business-process. The basic requirements for the implementation of the proposed model at the enterprise with multinomenclature production are described. The authors show the expediency of using this approach in integration of information flows of the system for automation of production technological preparation design and the system of operational and scheduling planning in design of production capacities load. As a result of the model implementation (on the basis of 1c: Enterprise 7.7) and carrying out a series of experiments, a reasonable conclusion about the effectiveness of the proposed scheme of developing IRpp for enterprises manufacturing multinomenclature products.

Design of work centers load, mathematical model, planning system, issue-related production plan.