ISSN 1991-2927
 

ACP № 4 (62) 2020

Author: "Andrei Alekseevich Pertsev"

/table>

Andrei Alekseevich Pertsev, Candidate of Sciences in Engineering; graduated from the Faculty of Mechanics and Mathematics of Ulyanovsk State University; Head of department at FRPC JSC ‘RPA ‘Mars’; an author of articles in the field of the automated enterprise management system implementation. e-mail: mars@mv.ruA.A. Pertsev,

Aleksandr Nikolaevich Podobrii, Candidate of Sciences in Engineering; graduated from the Faculty of Mechanics and Mathematics of Ulyanovsk State University; Deputy Chief of department at FRPC JSC ‘RPA ‘Mars’; an author of articles in the field of the automated enterprise management system implementation. e-mail: mars@mv.ruA.N. Podobrii,

Iuliia Aleksandrovna Radionova, Candidate of Sciences in Engineering; graduated from the Faculty of Mechanics and Mathematics of Ulyanovsk State University; Lead Programming Engineer at FRPC JSC ‘RPA ‘Mars’; an author of articles in the field of automated workflow systems, intelligent technical documentation storage bases and systems for statistical analysis of supplier appraisal; research interests are in the field of electronic document management, archival depositories, statistical data analysis, decision support systems. e-mail: julia-owl@mail.ruI.A. Radionova

The balanced production load of a machine-engineering organization62_6.pdf

The article deals with an approach to calculation of equipment, employee or work centers load during the production plan forming by machine engineering organizations. The calculations are based on the duration of manufacturing operations and the electronic structure of items, and provide the most balanced workload at the shortest time of production. The article describes the model of item production and the technique of production plan forming according to each work center with the set of calculation constraints. It also calculates the efficiency of an equipment load and time of production based on the current production plan. The calculation of load plan for work centers is provided by auxiliary software module of an interactive web-resource using the T-SQL.

Forming of production plan, critical path, network diagram, small-lot production, design production, machine manufacturing, capacity, statistics of operations flow, shiftwork scheduling.

2020_ 4

Sections: Information systems

Subjects: Information systems.

Andrei Alekseevich Pertsev, Federal Research-and-Production Center Joint Stock Company ‘Research-and-Production Association ‘Mars’, Candidate of Science in Engineering; graduated from the Faculty of Mechanics and Mathematics of Ulyanovsk State University; Head of a department of Federal Research-and-Production Center Joint Stock Company ‘Research-and-Production Association ‘Mars’; an author of articles in the field of the implementation of management information and control system. [e-mail: mars@mv.ru]A. Pertsev,

Aleksandr Nikolaevich Podobrii, Federal Research-and-Production Center Joint Stock Company ‘Research-and-Production Association ‘Mars’, Candidate of Science in Engineering; graduated from the Faculty of Mechanics and Mathematics of Ulyanovsk State University; Chief Specialist at FRPC JSC ‘RPA ‘Mars’; an author of articles in the field of the implementation of management information and control system. [e-mail: mars@mv.ru]A. Podobrii

Production Planning of the Machine-building Enterprise 55_9.pdf

The article deals with an approach to the automated production planning of design organization that manufactures machine- building equipment calculating the assembly-unit manufacturing sequence based on the average duration performance of the technological operations and the electronic structure of the product. The manufacturing duration of all the assembly units is determined. The time margin of the technological operations implementation is calculated on the basis of the assembly unit critical-path method.A model of product manufacturing is described. An algorithm of work centers planning with a set of restrictions used in the calculations is presented. Operating rate is analyzed as well as production capacity of production departments is calculated on the basis of a statistical estimation of the manufacturing schedule in previous periods and product campaign. The software implementation of the plan is presented in the form of an interactive web resource, which uses the method of constructing summary tables.

Production planning, critical path, diagram network, small-scale production, project manufacturing, machine-building, production capacity, statistics of operation implementation, shift-day production planning.

2019_ 1

Sections: Computer-aided engineering

Subjects: Computer-aided engineering.



Vladimir Anatolevich Maklaev, Federal Research-and-Production Center Open Joint-Stock Company ‘Research-and-Production Association ‘Mars’, Candidate of Engineering; graduated from the Radio-Engineering Faculty of Ulyanovsk Polytechnic Institute; Director General of the Federal Research-and-Production Center Open Joint-Stock Company ‘Research-and-Production Association ‘Mars’; an author of articles in the field of CAD. [e-mail: mars@mv.ru]V. Maklaev,

Andrei Alekseevich Pertsev, Federal Research-and-Production Center Open Joint-Stock Company ‘Research-and-Production Association ‘Mars’, an external PhD student of the Computer Science Department of Ulyanovsk State Technical University; graduated from the Mechanics and Mathematics Faculty of Ulyanovsk State University; a department chief at FRPC OJSC ‘RPA ‘Mars’; an author of articles in the field of CAD. [e-mail: mars@mv.ru]A. Pertsev,

Petr Ivanovich Sosnin, Ulyanovsk State Technical University, Honored Worker of the Higher School of the Russian Federation, Doctor of Engineering, Professor; graduated from the Radio-Engineering Faculty of Ulyanovsk Polytechnic Institute; a head of the Computer Science Department at Ulyanovsk State Technical University; an author of numerous works in the field of conceptual design of computer-aided systems. [e-mail: sosnin@ulstu.ru]P. Sosnin

An Approach to a Personalized Designer Model Generation and Use 34_8.pdf

The paper presents tools for computer-aided generation of personalized designer models in an organization developing computer-aided system families. The implementation is oriented at design processes and an experience base is used for its information service.

Computer-aided design, experience base, personal job description, professional maturity.

2013_ 4

Sections: Artificial intelligence system

Subjects: Artificial intelligence, Computer-aided engineering, Information systems.


© FRPC JSC 'RPA 'Mars', 2009-2018 The web-site runs on Joomla!